(Click Category to List Courses)

8 - CCE - Civil and Construction Engineering


CCE 428 - Survey & Profile Using Total Station

Code Start Date Duration Venue Fees
CCE 428 17 August 2019 5 Days Istanbul $ 2950 Registration Form Link
CCE 428 14 September 2019 5 Days Istanbul $ 2950 Registration Form Link
CCE 428 12 October 2019 5 Days Istanbul $ 2950 Registration Form Link
CCE 428 09 November 2019 5 Days Istanbul $ 2950 Registration Form Link
CCE 428 07 December 2019 5 Days Istanbul $ 2950 Registration Form Link
DOWNLOAD PDF

 

Course Description

In this course the participants will review the principal surveying engineering. They will be explore surveying including surveying meaning, survey types and map contains. They will also be intoduced to survey instruments and measurements principals and will learn how to use them. Finally the course is concluded by an intoduction to survey engineering computer software AutoCAD.

 

Course Objectives

  • Discussing the principal surveying engineering
  • Identify and recognize the various survey instruments with simulation program including tape, theodolite, level, total station
  • Learning how to use each tool 
  • Practicing the survey engineering computer software covering AutoCAD 

Who Should Attend?

  • Project Administrators
  • Engineers
  • Managers
  • Superintendents 
  • Anyone interested in survey & profile using total station 

Course Details/Schedule

Day 1

  • Survey meaning
  • Survey types 
  • Map contains 
  • Survey Instruments , Measurements principals

Day 2

  • Survey Instruments with Simulation Program
  • Tapes
  • When to use tapes 
  • How to use them 
  • Available types
  • Theodolite 
  • Types of Theodolites
  • Parts of a Theodolite
  • Concept of operation
  • Errors in measurement
  • Advantages of using a Theodolite

Day 3

  • Levels 
  • Parts of a level 
  • Measuring with the level 
  • Line levelling 
  • Longitudinal and transverse profiles 
  • The digital level
  • The rotation laser
  • Total Station
  • Preparing to measure
  • Extrapolating a straight line
  • Polar setting-out of a point 
  • Plumbing down from a height point
  • Surveys (polar method)

Day 4

  • Applications programs
  • Calculating areas 
  • Staking out
  • Remote heights
  • Tie distances 
  • Free-station surveys
  • Creating a survey database

Day 5

  • Using AutoCAD
  • Making an equipment database current
  • Deleting an equipment definition
  • Setting up the database and drawing
  • Setting the equipment and figuring prefix databases