TRAINING CATEGORIES
(Click Category to List Courses)

11 - OGE-C - Oil & Gas - Completion and Production Engineering


OG-C 120 - Surface Well Testing

Code Start Date Duration Venue
OG-C 120 15 April 2024 5 Days Istanbul Registration Form Link
OG-C 120 20 May 2024 5 Days Istanbul Registration Form Link
OG-C 120 24 June 2024 5 Days Istanbul Registration Form Link
OG-C 120 29 July 2024 5 Days Istanbul Registration Form Link
OG-C 120 02 September 2024 5 Days Istanbul Registration Form Link
OG-C 120 07 October 2024 5 Days Istanbul Registration Form Link
OG-C 120 11 November 2024 5 Days Istanbul Registration Form Link
OG-C 120 16 December 2024 5 Days Istanbul Registration Form Link
Please contact us for fees

 

Course Description

Surface well testing is the only technique available today that assesses the true reservoir potential at full scale under dynamic conditions. It validates well performance during cleanup and commissioning and allows reservoir monitoring for better field management. In this course, participants will learn about a wide variety of surface well testing equipment available for exploration and appraisal operations.

Course Objectives

  • Discussing the theory of well test analysis
  • Identifying main flow regimes and models
  • Carrying out well test analysis
  • Learning about time-saving cleanup operations
  • Simplifying the sea fastening process

Who Should Attend?

  • Reservoir engineers
  • Geoscientists
  • Petroleum engineers 
  • Production engineers

Course Details/Schedule

Day 1

  • Multiphase Flow Measurement (MPFM)
  • MPFM requirements
  • Individual-phase flow rates in real time
  • General MPFM process
  • Electrical impedance methods

Day 2

  • Oil, water, and gas flow rates without separation
  • Well test separators
  • Surface sampling
  • Sample bottle
  • Gas sample bottles

Day 3

  • Single-phase sample bottle
  • Wellhead sampling manifold
  • Zero pressure oil and water containers
  • Modular compact well test system

Day 4

  • Well testing control equipment
  • Flowhead
  • Surface safety valve
  • Well test emergency shutdown system
  • Floor choke manifold

Day 5

  • Effluent handling and disposal
  • Clearphase mobile testing discharge treatment
  • Evergreen well effluent burner
  • Dual-pot sand filter
  • Steam-heat exchanger
  • Indirect-fired heater
  • Vertical surge tank
  • Atmospheric gauge tank