(Click Category to List Courses)

2 - OGE - Oil & Gas


OGE 224 - Surface Well Testing

Code Start Date Duration Venue Fees
OGE 224 16 November 2019 5 Days Istanbul $ 3950 Registration Form Link
OGE 224 14 December 2019 5 Days Istanbul $ 3950 Registration Form Link
OGE 224 15 February 2020 5 Days Istanbul $ 3950 Registration Form Link
OGE 224 11 April 2020 5 Days Istanbul $ 3950 Registration Form Link
OGE 224 06 June 2020 5 Days Istanbul $ 3950 Registration Form Link
OGE 224 08 August 2020 5 Days Istanbul $ 3950 Registration Form Link
OGE 224 26 September 2020 5 Days Istanbul $ 3950 Registration Form Link
OGE 224 21 November 2020 5 Days Istanbul $ 3950 Registration Form Link
OGE 224 19 December 2020 5 Days Istanbul $ 3950 Registration Form Link
DOWNLOAD PDF

 

Course Description

Surface well testing is the only technique available today that assesses the true reservoir potential at full scale under dynamic conditions. It validates well performance during cleanup and commissioning and allows reservoir monitoring for better field management. In this course, participants will learn about a wide variety of surface well testing equipment available for exploration and appraisal operations.

Course Objectives

  • Discussing the theory of well test analysis
  • Identifying main flow regimes and models
  • Carrying out well test analysis
  • Learning about time-saving cleanup operations
  • Simplifying the sea fastening process

Who Should Attend?

  • Reservoir engineers
  • Geoscientists
  • Petroleum engineers 
  • Production engineers

Course Details/Schedule

Day 1

  • Multiphase Flow Measurement (MPFM)
  • MPFM requirements
  • Individual-phase flow rates in real time
  • General MPFM process
  • Electrical impedance methods

Day 2

  • Oil, water, and gas flow rates without separation
  • Well test separators
  • Surface sampling
  • Sample bottle
  • Gas sample bottles

Day 3

  • Single-phase sample bottle
  • Wellhead sampling manifold
  • Zero pressure oil and water containers
  • Modular compact well test system

Day 4

  • Well testing control equipment
  • Flowhead
  • Surface safety valve
  • Well test emergency shutdown system
  • Floor choke manifold

Day 5

  • Effluent handling and disposal
  • Clearphase mobile testing discharge treatment
  • Evergreen well effluent burner
  • Dual-pot sand filter
  • Steam-heat exchanger
  • Indirect-fired heater
  • Vertical surge tank
  • Atmospheric gauge tank