TRAINING CATEGORIES
(Click Category to List Courses)

17 - MSE - Maintenance, Scheduling, Planning


MSE 132 - Operation and Maintenance of the Wastewater Treatment Plant

Code Start Date Duration Venue
MSE 132 22 April 2024 5 Days Istanbul Registration Form Link
MSE 132 06 May 2024 5 Days Istanbul Registration Form Link
MSE 132 03 June 2024 5 Days Istanbul Registration Form Link
MSE 132 29 July 2024 5 Days Istanbul Registration Form Link
MSE 132 26 August 2024 5 Days Istanbul Registration Form Link
MSE 132 23 September 2024 5 Days Istanbul Registration Form Link
MSE 132 21 October 2024 5 Days Istanbul Registration Form Link
MSE 132 18 November 2024 5 Days Istanbul Registration Form Link
MSE 132 16 December 2024 5 Days Istanbul Registration Form Link
Please contact us for fees

 

Course Description

The Participants will acquire an understanding of the wastewater reuse permits and standards, wastewater characterization,  general plant description, monitoring, preventative maintenance, in addition to daily and monthly records and reporting.

Course Objectives

  • Obtaining a good idea about wastewater reuse permits and standards
  • Designing and conducting monitoring and surveillance program for the WWTP
  • Learning how to conduct  preventative maintenance
  • Learning how to interpret WW characterization results
  • Learning how to manage records and preparing reports

Who Should Attend?

  • Wastewater treatment plant operators
  • Muncibailites director of water and wastewater sections
  • Environmental engineers 
  • WWTP technicians

Course Details/Schedule

Day 1

  • Operator Responsibilities
  • System Operator Training Requirements
  • Management Responsibility
  • Municipal Wastewater Reuse Permit
  • Monitoring Requirements 

Day 2

  • Facility Description
  • Principal Design Criteria
  • Wastewater Characteristics 
  • Operation and Control of Unit Operations
  • Wastewater Flow Meters 
  • Pressure Main
  • Lagoon System
  • Normal Operation 
  • Aeration System
  • Process Controls

Day 3

  • Operational Monitoring
  • Operational Parameters
  • General Monitoring Requirements for Lagoon Operation
  • Compliance Monitoring

Day 4

  • Analytical Methods
  • Loading Rate Calculations
  • Monitoring Quality Assurance
  • Monitoring Summary

Day 5

  • General Plant Appearance
  • Equipment Maintenance and Scheduling
  • Supplies and Spare Parts
  • Plans and Specifications
  • Daily Operating Log
  • Operation, Sampling, and Testing Log
  • Summary Reports
  • Maintenance Records