EEE 116 - Partial Discharge

Code Start Date Duration Venue
EEE 116 14 October 2024 5 Days Istanbul Registration Form Link
EEE 116 18 November 2024 5 Days Istanbul Registration Form Link
EEE 116 23 December 2024 5 Days Istanbul Registration Form Link
Please contact us for fees

 

Course Description

Partial Discharge (PD), as its name would suggest, is an electrical discharge that occurs across a portion of the insulation between two conducting electrodes, without completely bridging the gap. PD's are caused when there is a discontinuity in the insulation system and as a general 'rule-of-thumb' PD will occur in systems operating at voltages of 3000V and above (although it should be noted that PD can occur at lower voltages than this). Partial discharges can occur in voids in solid insulation (paper, polymer etc), along the interfaces of multi-layer solid insulation systems, in gas bubbles in liquid insulation or around an electrode in a gas (corona discharge). Partial Discharge activity can initiate under normal working conditions in high voltage equipment where the insulation condition has deteriorated with age, has been aged prematurely by thermal or electrical over-stressing or due to improper installation (this leads to 'infant mortality'). PD can often be observed with the commissioning of new equipment due to improper installation, poor design and/or workmanship (this is seen particularly in cable joints and terminations which are made-up on site). It is known that poor workmanship can lead to 'infant mortality' of MV/HV networks with a disproportionate percentage of insulation failures being observed within the first 1-3 years of service compared to the rest of the service life of the cables/plant

Course Objectives

  • Understanding the basics of stator winding insulation systems and why they deteriorate
  • Understanding basic PD theory
  • Understanding how PD detection devices work
  • Interpreting the test data collected and relate the data to specific failure mechanisms, to enable you to plan maintenance

Who Should Attend?

  • Engineers working in HV department, in transmission and distribution
  • Maintenance engineers working in HV equipments
  • Senior technicians working in HV equipments

Course Details/Schedule

Day 1

  • Introduction to Partial Discharge and Diagnostics for High Voltage Equipment
  • Equipment failure mechanisms
  • Conventional and unconventional test techniques
  • On-line and Off-line methods
  • How to test different items of plant

Day 2

  • Deployment of PD Testing in Asset Management Programs
  • Ageing population problem
  • Focus plant replacements/avoid unplanned outage
  • Increasing failure rate or problem with a particular plant type
  • Troubleshooting and failure investigations
  • Safety (mostly with cable terminations & sealing ends/outdoor HV plant)
  • Quality Assurance

Day 3

  • Partial Discharge Testing and Diagnostics for MV and HV Cables
  • Introduction to test methodologies
  • PD Location methods
  • Assessing criticality
  • Case studies

Day 4

  • PD Testing and Diagnostics for MV Switchgear
  • Introduction to test methodologies
  • PD Location methods
  • Assessing criticality
  • Case studies

Day 5

  • Partial Discharge Testing and Diagnostics for Motors and Generators
  • Introduction to Online PD Testing of HV Motors & Generators
  • Recognising Phase-Resolved PD (PRPD) Patterns
  • Assessing criticality
  • Case studies

 

ETABS and SAFE. Training 24 CCE 210 5 SAP 2000. Training 25 CCE 305 5 Quality Assurance in Pavement Construction 26 CCE 401 5 Construction Project Management 27 CCE 402 10 Construction Project Management (10 Days) 28 CCE 403 5 Construction Project Management-Intensive 29 CCE 405 5 Principles of Construction Project Management 30 CCE 406 10 Principles of Construction Project Management (10 Days) 31 CCE 410 10 Construction Project and Risk Management (10 days) 32 CCE 411 5 Project & Contract Management for Marine Construction 33 CCE 412 5 Application of GIS in Construction Management 34 CCE 415 4 Sustainable Water Management Techniques, Innovation and Solution (4 Days) 35 CCE 419 5 Construction Management of Hydraulic Projects 36 CCE 420 5 Water Project Management 37 CCE 421 10 Modern Technologies in the Supervision and Quality Control of Irrigation Projects and Dealing with Contractors (10 Days) 38 CCE 422 5 Rapid Earthquake Hazard Evaluation of Buildings 39 CCE 425 10 Practical Application of Computers in Structural Engineering (10 Days) 40 CCE 428 5 Survey & Profile Using Total Station 41 CCE 430 5 Bridge Construction and Maintenance 42 CCE 435 5 Bridge Inspection and Maintenance 43 CCE-A 410 10 إدارة المشاريع الهندسية -10 أيام
21 - TTC - Transportation and Traffic Control
22 - ADV - Architectural Design and Visualization
23 - SRM - Safety and Occupational Health
24 - CSM - Public Relations, Communication Skills & Office Management
25 - TEM - Training and Education Management
26 - CMR - Customer Relations