(Click Category to List Courses)
8 - OGE-R - Oil & Gas - Reservoir Engineering
OGR 172 - Well Production Enhancement
Code | Start Date | Duration | Venue | |
---|---|---|---|---|
OGR 172 | 23 December 2024 | 5 Days | Istanbul | Registration Form Link |
OGR 172 | 17 March 2025 | 5 Days | Istanbul | Registration Form Link |
OGR 172 | 09 June 2025 | 5 Days | Istanbul | Registration Form Link |
OGR 172 | 01 September 2025 | 5 Days | Istanbul | Registration Form Link |
OGR 172 | 24 November 2025 | 5 Days | Istanbul | Registration Form Link |
OGR 172 | 22 December 2025 | 5 Days | Istanbul | Registration Form Link |
Course Description
This course concentrates on solving performance Optimization of the technologies that increase Oil and Gas, Well inflow and Outflow Performance, Well Production Optimization (NODAL) Well prediction, including Artificial Lift, Acid Stimulation and Hydraulic Fracturing, Well Intervention, Workovers, Problems Diagnosis, Sand Control and Management, Perforating Technology, Water production/Injection and Water control Shut-off Methods & productivity effects, Flow Assurance: Paraffins and Asphaltene: Diagrams, theory, Problems and Solutions, Scale deposition: Diagrams, Control, and new Technologies, Emulsion problems and Corrosion.
Course Objectives
- Study and discussion on Reservoir types and Productivity.
- Analysis and study of Well Productivity impairment.
- Study in details Well Inflow and Outflow Performance
- Work on Total Well Optimization Systems
- Review of Production Logging applications & Techniques
- Discussion and practice of Water production/control & Productivity effects
- Discussion and practice of Formation damage during drilling,
- Study Productivity and effect of Matrix Stimulation (Acidizing)
Who Should Attend?
- Technical personnel
- Reservoir and Production Engineers
- Chemical Engineers
- Mechanical Engineers
- Geologists
- Field operations
Course Details/Schedule
Day 1
- Total optimization well production enhancement
- Well performance & productivity description
- Reservoir types and performance
- Perforating technology and effect on well productivity
- Perforating design and effect on well production enhancement
- Well productivity due to impairment
- Analysis of Well Inflow & Outflow performance
- Design, problems diagnosis and solving performance optimization
- Total Well (NODAL) system analysis
- Exercises, problems and solutions
Day 2
- Water control shut-off
- Perforation desing and formation damage evaluation and mitigation
- Production logging applications & techniques,
- Sources and causes of productivity impairment
- Formation damage during drilling,
- Completion and production phases,
- Introduction to water production/Injection control Shut-off Methods and Conformance Technologies & productivity effects
- Examples, problems and solutions
Day 3
- Well intervention for productivity enhancement through matrix stimulation, hydraulic fracturing
- Well intervention for productivity enhancement
- Productivity and effect of matrix stimulation (acidizing)
- Productivity and the effect hydraulic fracturing technology
- Candidate selection & stimulation
- Candidate selection exercise
Day 4
- Productivity enhancement with workover, sand control, design and flow assurance
- Well intervention for productivity enhancement
- Productivity enhancement with workovers
- Productivity enhancement with through-tubing techniques
- Sand production control design and productivity effects
- Flow assurance: paraffins and asphaltene: diagrams, theory, problems and solutions, scale deposition: diagrams, control, and new technologies, emulsion problems and corrosion
- Examples, problems and solutions
Day 5
- Well production enhancement by using artificial lifts
- Productivity enhancement through artificial lift
- Electrical Submersible Pumps (ESP) system
- Progressive cavity pump artificial lift system
- Sucker rod pumping artificial lift system and other systems
- Presentation of the ESP and PCP systems
- Exercises, problems and solutions