TRAINING CATEGORIES
(Click Category to List Courses)

8 - OGE-R - Oil & Gas - Reservoir Engineering


OGR 172 - Well Production Enhancement

Code Start Date Duration Venue
OGR 172 23 December 2024 5 Days Istanbul Registration Form Link
OGR 172 17 March 2025 5 Days Istanbul Registration Form Link
OGR 172 09 June 2025 5 Days Istanbul Registration Form Link
OGR 172 01 September 2025 5 Days Istanbul Registration Form Link
OGR 172 24 November 2025 5 Days Istanbul Registration Form Link
OGR 172 22 December 2025 5 Days Istanbul Registration Form Link
Please contact us for fees

 

Course Description

This course concentrates on solving performance Optimization of the technologies that increase Oil and Gas,  Well inflow and Outflow Performance, Well Production Optimization (NODAL) Well prediction, including Artificial Lift, Acid Stimulation and Hydraulic Fracturing, Well Intervention, Workovers, Problems Diagnosis, Sand Control and Management, Perforating Technology, Water production/Injection and Water control Shut-off Methods & productivity effects, Flow Assurance: Paraffins and Asphaltene: Diagrams, theory, Problems and Solutions, Scale deposition: Diagrams, Control, and new Technologies, Emulsion problems and Corrosion.

Course Objectives

  • Study and discussion on Reservoir types and Productivity.
  • Analysis and study of Well Productivity impairment.
  • Study in details Well Inflow and Outflow Performance
  • Work on Total Well Optimization Systems
  • Review of Production Logging applications & Techniques
  • Discussion and practice of Water production/control & Productivity effects
  • Discussion and practice of Formation damage during drilling,
  • Study Productivity and effect of Matrix Stimulation (Acidizing)

Who Should Attend?

  • Technical personnel
  • Reservoir and Production Engineers
  • Chemical Engineers
  • Mechanical Engineers
  • Geologists
  • Field operations

Course Details/Schedule

Day 1

  • Total optimization well production enhancement 
  • Well performance & productivity description
  • Reservoir types and performance
  • Perforating technology and effect on well productivity
  • Perforating design and effect on well production enhancement
  • Well productivity due to impairment
  • Analysis of Well Inflow & Outflow performance
  • Design, problems diagnosis and solving performance optimization
  • Total Well (NODAL) system analysis
  • Exercises, problems and solutions     

Day 2

  • Water control shut-off 
  • Perforation desing and formation damage evaluation and mitigation
  • Production logging applications & techniques,
  • Sources and causes of productivity impairment
  • Formation damage during drilling,
  • Completion and production phases,
  • Introduction to water production/Injection control Shut-off Methods and Conformance Technologies & productivity effects
  • Examples, problems and solutions

Day 3

  • Well intervention for productivity enhancement through matrix stimulation, hydraulic fracturing
  • Well intervention for productivity enhancement
  • Productivity and effect of matrix stimulation (acidizing)
  • Productivity and the effect hydraulic fracturing technology
  • Candidate selection & stimulation
  • Candidate selection exercise

Day 4

  • Productivity enhancement with workover, sand control, design and flow assurance
  • Well intervention for productivity enhancement
  • Productivity enhancement with workovers
  • Productivity enhancement with through-tubing techniques
  • Sand production control design and productivity effects
  • Flow assurance: paraffins and asphaltene: diagrams, theory, problems and solutions, scale deposition: diagrams, control, and new technologies, emulsion problems and corrosion
  • Examples, problems and solutions

Day 5

  • Well production enhancement by using artificial lifts
  • Productivity enhancement through artificial lift
  • Electrical Submersible Pumps (ESP) system
  • Progressive cavity pump artificial lift system
  • Sucker rod pumping artificial lift system and other systems
  • Presentation of the ESP and PCP systems
  • Exercises, problems and solutions

 

ETABS and SAFE. Training 24 CCE 210 5 SAP 2000. Training 25 CCE 305 5 Quality Assurance in Pavement Construction 26 CCE 401 5 Construction Project Management 27 CCE 402 10 Construction Project Management (10 Days) 28 CCE 403 5 Construction Project Management-Intensive 29 CCE 405 5 Principles of Construction Project Management 30 CCE 406 10 Principles of Construction Project Management (10 Days) 31 CCE 410 10 Construction Project and Risk Management (10 days) 32 CCE 411 5 Project & Contract Management for Marine Construction 33 CCE 412 5 Application of GIS in Construction Management 34 CCE 415 4 Sustainable Water Management Techniques, Innovation and Solution (4 Days) 35 CCE 419 5 Construction Management of Hydraulic Projects 36 CCE 420 5 Water Project Management 37 CCE 421 10 Modern Technologies in the Supervision and Quality Control of Irrigation Projects and Dealing with Contractors (10 Days) 38 CCE 422 5 Rapid Earthquake Hazard Evaluation of Buildings 39 CCE 425 10 Practical Application of Computers in Structural Engineering (10 Days) 40 CCE 428 5 Survey & Profile Using Total Station 41 CCE 430 5 Bridge Construction and Maintenance 42 CCE 435 5 Bridge Inspection and Maintenance 43 CCE-A 410 10 إدارة المشاريع الهندسية -10 أيام
21 - TTC - Transportation and Traffic Control
22 - ADV - Architectural Design and Visualization
23 - SRM - Safety and Occupational Health
24 - CSM - Public Relations, Communication Skills & Office Management
25 - TEM - Training and Education Management
26 - CMR - Customer Relations