(Click Category to List Courses)
10 - OGE-W - Oil & Gas - Well Construction and Drilling
OG-W 140 - Rig Equipment
Code | Start Date | Duration | Venue | |
---|---|---|---|---|
OG-W 140 | 23 December 2024 | 5 Days | Istanbul | Registration Form Link |
OG-W 140 | 27 January 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 140 | 24 March 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 140 | 19 May 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 140 | 14 July 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 140 | 08 September 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 140 | 03 November 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 140 | 29 December 2025 | 5 Days | Istanbul | Registration Form Link |
Course Description
The rig consists of main and auxiliary components that are operated together to achieve a certain role, drilling a hole, run casing, repair a failed well. Knowing the different items, operation windows and limitations, procedures and standards, measures and controls is the purpose of this course. Basic and new technology for rig equipment are discussed as well. By the end of this course you will be able to name and to know the role of different rig equipment.
Course Objectives
- Learning the terminology used in drilling operations
- Naming the different rig equipment
- Exploring power system and efficiency factors
- Estimating the required power to operate the rig
- Learning limitations and testing of different equipment
- Learning correct practices while handling equipment/materials on rig site
Who Should Attend?
- Fresh Graduated Drilling Engineers
- Drilling Engineers
- Well construction related people
- Drillers
- Assistant drillers
- New tool pushers
- Night pushers
Course Details/Schedule
Day 1
- Drilling sites, derricks and masts
- Types of rigs
- On shore
- offshore rigs
- Rig power system
Day 2
- Rotary equipment
- Kelly types
- Rotary table
- TDS system
- Drill pipe handling equipment
Day 3
- Hoisting equipment
- Auxiliary hoisting equipment
- Wire rope
- Block line
- Ton mile / slip and cut
Day 4
- Drilling fluid system
- Drilling fluid preparation equipment
- Mud treatment equipment
- Rig pumps
- Centrifugal pumps
Day 5
- Rig instrumentation
- Well control equipment
- BOP, control units
- Requirement and pressure ratings
- Stripping equipment