TRAINING CATEGORIES
(Click Category to List Courses)

10 - OGE-W - Oil & Gas - Well Construction and Drilling


OG-W 140 - Rig Equipment

Code Start Date Duration Venue
OG-W 140 22 April 2024 5 Days Istanbul Registration Form Link
OG-W 140 27 May 2024 5 Days Istanbul Registration Form Link
OG-W 140 01 July 2024 5 Days Istanbul Registration Form Link
OG-W 140 05 August 2024 5 Days Istanbul Registration Form Link
OG-W 140 09 September 2024 5 Days Istanbul Registration Form Link
OG-W 140 14 October 2024 5 Days Istanbul Registration Form Link
OG-W 140 18 November 2024 5 Days Istanbul Registration Form Link
OG-W 140 23 December 2024 5 Days Istanbul Registration Form Link
Please contact us for fees

 

Course Description

The rig consists of main and auxiliary components that are operated together to achieve a certain role, drilling a hole, run casing, repair a failed well. Knowing the different items, operation windows and limitations, procedures and standards, measures and controls is the purpose of this course. Basic and new technology for rig equipment are discussed as well. By the end of this course you will be able to name and to know the role of different rig equipment.

Course Objectives

  • Learning the terminology used in drilling operations
  • Naming the different rig equipment
  • Exploring power system and efficiency factors
  • Estimating the required power to operate the rig
  • Learning limitations and testing of different equipment 
  • Learning correct practices while handling equipment/materials on rig site

Who Should Attend?

  • Fresh Graduated Drilling Engineers
  • Drilling Engineers
  • Well construction related people
  • Drillers
  • Assistant drillers
  • New tool pushers
  • Night pushers

Course Details/Schedule

Day 1

  • Drilling sites, derricks and masts
  • Types of rigs
  • On shore 
  • offshore rigs
  • Rig power system

Day 2

  • Rotary equipment
  • Kelly types 
  • Rotary table
  • TDS system
  • Drill pipe handling equipment

Day 3

  • Hoisting equipment
  • Auxiliary hoisting equipment
  • Wire rope
  • Block line
  • Ton mile / slip and cut

Day 4

  • Drilling fluid system
  • Drilling fluid preparation equipment 
  • Mud treatment equipment
  • Rig pumps
  • Centrifugal pumps

Day 5

  • Rig instrumentation
  • Well control equipment 
  • BOP, control units
  • Requirement and pressure ratings
  • Stripping equipment