(Click Category to List Courses)
10 - OGE-W - Oil & Gas - Well Construction and Drilling
OG-W 155 - XMAS Trees and Well Heads
Code | Start Date | Duration | Venue | |
---|---|---|---|---|
OG-W 155 | 30 December 2024 | 5 Days | Istanbul | Registration Form Link |
OG-W 155 | 24 February 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 155 | 21 April 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 155 | 16 June 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 155 | 11 August 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 155 | 06 October 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 155 | 01 December 2025 | 5 Days | Istanbul | Registration Form Link |
Course Description
Xmas Trees and Well Heads are critical parts of any Oil & Gas Well. They control the pressures in the Casings and Production Tubing, regulate the production rates and are very important barriers in case of leaks.
This intensive Xmas Trees and Well Heads Operation and Testing training course will highlight all components of a Well Head and of a Xmas Tree and the installation sequence . Casing and tubing seals (monitoring and leak repairs) different sauses of SAP pressures and hazards originated by faulty wellheads (and their mitigation) will also be discussed.
Course Objectives
- Develop the knowledge relationship between surface (Well Heads) and downhole.
- Investigate leaks and identify cause of leak
- Determine Tubing pressures (based on depth of perfs, density of fluid and BHFP).
- Investigate SAP pressures based on well pressure monitoring using 2 and 3 pen recorders.
- Explain influence of corrosion models on MAASP pressures and on Well Life Cycle
Who Should Attend?
- Field Services Foremen
- Operations Foremen
- Petroleum Engineers
- Production Engineers
- Drilling Engineers
- Completion Engineers
- Oil Field Technical Staff
Course Details/Schedule
Day 1
- Operational Safety
- Reservoirs, wells and well heads
- Problems caused by poor cement jobs
- Well construction and primary cement jobs
- Construction of a well from Casings to Well Head.
- Productivity Index calculated at Well Head
- Well head main functions
- Practical Calculations to determine Tubing Pressures based on several factors.
- Well head classifications
- API Specification 6A
- Basic Components of a Well Head
- Well Head Installation movie
- Casing Head / Casing Head Function
Day 2
- Casing Spool / Casing Spool function
- Casing Hangers
- Tubing Heads and Tubing Hangers
- Investigation and Discussion of SAP Case 2.
- Continuation of tubing hangers
- Tubing Head Adapters
- Typical Xmas Tree Components.
- Fix Chokes and Adjustable Chokes
- Flanges (6B and 6BX types)
- Seals and gaskets
- Unitized Well Head
- The BOP
Day 3
- Xmas Tree Installation
- Well Head Repairs
- Hydraulic and Pneumatic Actuators
- Investigation and discussion of SAP Case 3
- Casing Hangers and Well Pressure Control
- Common Pack Offs and Secondary Seals
- Tubing Hangers (cross sections)
- Tests and Leak Path Determination
- Unitized Well Heads
- Basic rules for Pressure Testing Well Heads
- Test Schematics of Well Heads.
- Basic requirements of a Well Completion
- Casing String types
- Liners, liner hangers and tie back liners
- Effects of pressure in “b” and “c” annulus
Day 4
- Well Head Repairs and Casing Repairs
- Surface Casing corrosion
- Burst and Collapse Pressure Decline with time.
- MAASP Calculations for annulus A
- Short introduction on Material Selection
- Corrosion Monitoring Tools
- Cathodic Protection
- Well Integrity : Safety and Operational aspects
- Constructing a well with Integrity
- Well Integrity Issues
- The important of SC-SSSV
- Well Head Components and well integrity assurance guidelines.
Day 5
- Risk Management
- WIMS : Well Integrity Management System.
- Industry Standards and Guidelines
- Well Integrity Drivers and Implementation
- Well Integrity Envelope
- Well Integrity, Annular Pressures and Well Head Monitoring
- SAP (Sustainable Annulus Pressures) Wells