(Click Category to List Courses)
8 - OGE-W - Oil & Gas - Well Construction and Drilling
OG-W 157 - Hoisting System in Drilling Rigs
Code | Start Date | Duration | Venue | |
---|---|---|---|---|
OG-W 157 | 23 June 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 157 | 18 August 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 157 | 13 October 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 157 | 08 December 2025 | 5 Days | Istanbul | Registration Form Link |
Course Description
The aim of this 5-day course is to equip participants with a solid understanding of the hoisting system in drilling rigs, including its components, operation, and safety measures. This course provides in-depth knowledge of the drawworks, wire rope, blocks, and other essential equipment, ensuring that participants can safely and efficiently handle loads during drilling operations.
Through a combination of theory, practical exercises, and case studies, participants will learn how to maintain, troubleshoot, and optimize the performance of the hoisting system. The course emphasizes industry safety standards and prepares participants to manage hoisting operations effectively, minimizing risks and maximizing efficiency on the rig.
Course Objectives
- Understanding and describe key components of the hoisting system, including drawworks, wire rope, and blocks
- Performing load calculations to determine safe working limits
- Operating the hoisting system efficiently while following best safety practices
- Conducting inspections and maintenance to enhance equipment reliability
- Troubleshooting common issues like wire rope wear and brake malfunctions
- Ensuring compliance with industry safety standards (API, OSHA)
- Learning from real-world case studies to improve safety and performance
Who Should Attend?
- Drilling Engineers
- Rig Floor Personnel
- Maintenance Personnel
- Safety Officers and Managers
- Anyone seeking to gain a deeper understanding of hoisting systems and their safe operation
Course Details/Schedule
Day 1
- Introduction to the Hoisting System
- Overview of Drilling Rig Systems
- Introduction to drilling rig components
- Role of the hoisting system in drilling operations
- Hoisting System Components
- Drawworks: functions and types
- Mast and derrick: structure and design
- Crown block and traveling block
- Deadline and fastline
- Wire rope (drill line): selection and maintenance
- Safety Guidelines
- General safety precautions around the hoisting system
- Personal protective equipment (PPE) for rig workers
Day 2
- Hoisting System Operations
- Drawworks Operations
- Operating principles
- Understanding brakes, clutches, and motors
- Handling loads
- Drilling Line Handling
- Importance of proper tensioning and spooling
- Block System
- Crown block and traveling block alignment
- Load management
Day 3
- Calculations and Performance Evaluation
- Load Calculations
- Load capacities of the hoisting system
- Determining maximum safe working loads
- Mechanical advantage in block systems
- Efficiency and Performance
- Factors affecting hoisting efficiency
- Methods to improve hoisting performance
Day 4
- Advanced Hoisting Techniques and Troubleshooting
- Handling Critical Loads
- Safe hoisting of casing and tubing
- Techniques for hoisting large diameter pipes
- Troubleshooting Hoisting System Failures
- Identifying and addressing common issues (e.g., wire rope failures, brake malfunctions)
- Minimizing downtime during repairs
- Automation in Hoisting Systems
- Introduction to automated hoisting controls and monitoring systems
Day 5
- Safety, Regulations, and Case Studies
- Hoisting System Safety Regulations
- Compliance with industry standards (API, OSHA)
- Emergency procedures for hoisting operations
- Case Studies
- Review of hoisting system-related incidents
- Lessons learned from real-world examples