10 - OGE-W - Oil & Gas - Well Construction and Drilling
OG-W 205 - Casing and Cementing
Code | Start Date | Duration | Venue | |
---|---|---|---|---|
OG-W 205 | 30 December 2024 | 5 Days | Istanbul | Registration Form Link |
OG-W 205 | 13 January 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 205 | 10 March 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 205 | 05 May 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 205 | 30 June 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 205 | 25 August 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 205 | 20 October 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 205 | 15 December 2025 | 5 Days | Istanbul | Registration Form Link |
Course Description
Cementing is a very important phase of the well construction plan. Operating company personnel must have a good working knowledge of cements, cementing additives, and placement procedures. The operator is critical to the success of the job. This course covers the importance of the cement sheath integrity during the life of the well. The parameters that the cement sheath will be subjected to must be considered. The course covers the use of cement formulations, cement additives, casing hardware, cement blending, on-site mixing equipment, and a well-planned job procedure. Cementing guidelines that aid in overall job performance will be covered.
Course Objectives
- Familiarizing with the selection of casing sizes and setting depths to achieve well objectives
- Determining casing loads for design purposes
- Designing casing properties to meet burst, collapse, and tensile strength requirements
- Conducting casing running operations safely and successfully
- Understanding the specification of cement slurry properties and volumes to meet well objectives
- Determining the best procedures for attaining successful primary cementing
- Conducting stage jobs, squeeze jobs, and set cement plugs
Who Should Attend?
- Operators
- Service personnel
- Personnel responsible for planning, overseeing, and conducting casing and cementing operations
Course Details/Schedule
Day 1
- Selecting casing and hole sizes
- Pore pressure and fracture pressure curves
- Setting depths
- Drilling / completion liners
- Casing loads
Day 2
- Selecting casing and connections
- API and Premium connection
- Casing stress calculations
- Cement and cement additives
- Casing accessories
Day 3
- API cement grades
- Cement calculations
- Selecting appropriate slurries
- Lab tests
- Mud removal and cement placement
Day 4
- Stage cementing, squeezes, and plugs
- Liner cementation
- Preventing gas migration
- Special slurries
- Emergency measures
Day 5
- Cementing equipment
- Cement storage and transfer
- Well head equipment
- Types of hangers
- Well control while cementing