TRAINING CATEGORIES
(Click Category to List Courses)

34 - TCM - Telecommunications Technologies


TCM 135 - Pathloss V Workshop

Code Start Date Duration Venue
TCM 135 28 October 2024 5 Days Istanbul Registration Form Link
TCM 135 02 December 2024 5 Days Istanbul Registration Form Link
Please contact us for fees

 

Course Description

Participants of this course will be able to plan microwave point-to-point links using software planning tool Pathloss 5.0, including ability to analyse data from path surveys, create respective profile data and decide upon antenna heights, calculate Performance and Availability percentages of the link and optimise them with respect to the ITU-R objectives as well as cost-effectiveness.

General Knowledge of Microwave Radio Communications Engineering Concepts.

The minimum number of participants required is 4 pax.

Course Objectives

  • Understanding General Program Operation and detailed functions of all the Pathloss software Modules. 
  • Understanding the meanings of different types of terrain data types, Geographic defaults, Datum and Ellipsoids, and their selection criteria 
  • Carrying out basic procedures to create terrain profiles from primary and secondary terrain data files. 
  • Carrying out antenna center line calculations and determine the minimum antenna heights which will result in acceptable diffraction loss at the lowest expected value of K with Pathloss diffraction Module 
  • Determining the optimal space diversity antenna spacing to avoid simultaneous signal nulls (Reflection Module) 
  • Generating Link Budgets and understand the significance of multipath propagation reliability and analyze microwave links 
  • Understanding and apply fade probability models and how to use the in Pathloss link predictions 
  • Calculating diffraction loss of a radio wave propagating over irregular terrain using a number of diffraction models supported by Pathloss program 
  • Conducting Interference calculations down to the composite threshold degradation of the victim receivers due to multiple interferers.

Course Overview

The offered course is a 5 days intensive Pathloss V link planning tool, which allowed students to develop an intuitive understanding of both the theoretical concepts and their practical application when planning links with Pathloss link planning tool. The Pathloss V program is a comprehensive path design tool for radio links operating in the frequency range from 30 MHZ to 100 GHz. The program is organized into several path design modules. 

 

Who Should Attend?

  • Telecommunication practicing engineers
  • Network designers
  • Engineering managers
  • IT professionals working in mobile operators
  • Oil & Gas sector and solution vendors who are responsible for planning, managing, optimization and maintenance of Transmission Network and systems

Course Details/Schedule

Day 1

  • Pathloss V Main Features 
  • General Program Organization 
  • Over view of Pathloss V Modules 
  • Terrain Data and Terrain databases 
  • Basic Procedure to Create a Terrain profile 
  • Geographic Defaults 
    • Datum Selection 
    • Ellipsoid Selection 
    • Latitude Longitude Formats 
    • Grid Coordinate System

Day 2

  • Display Options 
  • Profile Printing Options 
    • Flat Earth 
    • Curved Earth (Straight axis)
  • Creating links 
    • Summary Module 
    • Network Module
  • Profile Insertion 
    • Having a digital map 
    • Inserting manually 
    • Importing from a Text File 
  • Antenna Heights Calculations (VHF-UHF Applications) 
    • Antenna Configuration Setting 
    • Setting antenna Heights 
    • Optimizing Antenna Heights 
    • Setting Clearance Criteria 
    • Reports (Clearance, Orientation, Antenna height Tradeoff Report)

Day 3

  • VHF-UHF Antenna Heights 
    • Clearance Criteria 
    • Antenna Height Considerations
  • Microwave Worksheet 
    • Reliability options 
    • Including the Geoclimatic factor 
    • Defining rain attenuation 
    • Equipment definition 
    • Antenna definition 
    • Inserting the branching losses 
    • Choosing the frequency channels 
    • Copying link data 
    • Reports 
    • Diversity 

 

Day 4

  • Rain attenuation Calculations 
    • Rain Models Selection 
    • Polarization Selection 
    • Fade Margin 
    • Meaning of rain error Messages
  • Passive Repeaters 
    • Creating a Passive Repeater 
    • Propagation reliability Calculations on Passive Repeater
  • Diffraction Module 
    • Overview 
    • Total Loss Concept 
    • General Operation of the Diffraction Module 
    • Pathloss algorithms
  • Reflection Module and Reflection Analysis 
    • Reflective Plan definition 
    • Dispersion Analysis 
    • Diversity antenna spacing calculations 
    • Fresnel Zone tests 
    • Reports
  • Multipath Operation 
    • Overview 
    • Variable gradient 
    • Constant Gradient 
  • Network Module Overview 
    • Basic Operation 
    • Site List Data Imports 
    • Use of layers 
    • Link List 
    • Network Operations

Day 5

  • Interference calculation procedure 
    • Not correlated interferences 
    • Partially correlated interferences 
    • Fully correlated interferences 
    • Co-channel interference 
    • Adjacent channel interference
  • Intensive Class Work using Pathloss Program 
    • Microwave Antenna heights calculations 
    • Reflection Analysis Examples 
    • Diffraction Loss Calculations

 

 

ETABS and SAFE. Training 24 CCE 210 5 SAP 2000. Training 25 CCE 305 5 Quality Assurance in Pavement Construction 26 CCE 401 5 Construction Project Management 27 CCE 402 10 Construction Project Management (10 Days) 28 CCE 403 5 Construction Project Management-Intensive 29 CCE 405 5 Principles of Construction Project Management 30 CCE 406 10 Principles of Construction Project Management (10 Days) 31 CCE 410 10 Construction Project and Risk Management (10 days) 32 CCE 411 5 Project & Contract Management for Marine Construction 33 CCE 412 5 Application of GIS in Construction Management 34 CCE 415 4 Sustainable Water Management Techniques, Innovation and Solution (4 Days) 35 CCE 419 5 Construction Management of Hydraulic Projects 36 CCE 420 5 Water Project Management 37 CCE 421 10 Modern Technologies in the Supervision and Quality Control of Irrigation Projects and Dealing with Contractors (10 Days) 38 CCE 422 5 Rapid Earthquake Hazard Evaluation of Buildings 39 CCE 425 10 Practical Application of Computers in Structural Engineering (10 Days) 40 CCE 428 5 Survey & Profile Using Total Station 41 CCE 430 5 Bridge Construction and Maintenance 42 CCE 435 5 Bridge Inspection and Maintenance 43 CCE-A 410 10 إدارة المشاريع الهندسية -10 أيام
21 - TTC - Transportation and Traffic Control
22 - ADV - Architectural Design and Visualization
23 - SRM - Safety and Occupational Health
24 - CSM - Public Relations, Communication Skills & Office Management
25 - TEM - Training and Education Management
26 - CMR - Customer Relations