TRAINING CATEGORIES
(Click Category to List Courses)

36 - FBR - Fiber Optics and Related Technologies


FBR 115 - Fiber Optic Network Design and Maintenance (10 Days)

Code Start Date Duration Venue
FBR 115 23 December 2024 10 Days Istanbul Registration Form Link
FBR 115 24 February 2025 10 Days Istanbul Registration Form Link
FBR 115 21 April 2025 10 Days Istanbul Registration Form Link
FBR 115 16 June 2025 10 Days Istanbul Registration Form Link
FBR 115 11 August 2025 10 Days Istanbul Registration Form Link
FBR 115 06 October 2025 10 Days Istanbul Registration Form Link
FBR 115 01 December 2025 10 Days Istanbul Registration Form Link
Please contact us for fees

 

Course Description

The steadily growing need in transference range in communication systems has far excelled the expectations of the past and has changed the demands for future net structures radically. The new technologies which are installed today in the participant-access area as well as in the Wide Area Network technology (Long Distance) correspond to these new demands. This program provides the topical state of the technology and an overview about the measuring methods in the different optical systems. Participants in this workshop will learn to perform the measurements needed to install and maintain optical links. The major aim of the workshop is to learn how to use and maintain the instrument to obtain optimum results as quickly and efficiently as possible.

Course Objectives

  • Understanding the different telecommunication technologies
  • Being familiar with the fundamentals of Fiber Optic Networks
  • Learning the advantages and disadvantages of using Fiber Optic Networks
  • Learning how to operate, troubleshoot, and maintain Fiber Optic Networks

Who Should Attend?

  • Managers
  • Technicians
  • System analysts
  • Design engineers
  • Telecommunication professionals

Course Details/Schedule

Day 1

  • Introduction
  • Typical Lightwave System
  • Lightwave Sources
  • Lightwave Detectors
  • Optical Fiber
  • Fiber Drawing Process
  • Fiber Geometry (Multimode, Single Mode)
  • Optical Loss
  • Fiber Parameters
  • Product Terms

Day 2

  • Cable /Fiber Identification
  • OSP Cable Design (ODF)
  • Outside Plant Cable Splices
  • Building Cables
  • Building Cable Connectors (pigtail, patch cord)
  • Fiber Optic Splicing
  • Mechanical Splicing
  • Hands- On Mechanical Splicing
  • Fusion Splicing

Day 3

  • Description of the Fusion Machine
  • Console Panel
  • Procedures for Splicing
  • Correct Placement of Fiber in Splice
  • Closure
  • Splice Tray
  • Splicing Set Up Job Aid

Day 4

  • Heat Shrink Protective Sleeve
  • Splice Inspection and Tensile
  • Strength Test
  • Replacement of Electrodes and
  • Cleaning Objective Lenses
  • ARC Settings
  • Hands- On Fusion Splicing
  • Introduction To Fiber Optic Testing
  • Fiber Handling

Day 5

  • Safety
  • Cleaning
  • Fiber Cleaning Resources
  • Fiber Care
  • Technical Specifications
  • Proper Fiber Handling, Cleaning &
  • Inspection Techniques
  • Analyzing Endface
  • Fiber testing Resources
  • The Need For Basic Testing
  • Visual Fault Locator(VFL)

Day 6

  • Optical Time Domain Reflectometer (OTDR)
  • Optical Power Meter (OLP)
  • Optical Light Source (OLS)
  • Fiber Cleaning Kit
  • Associated Connectors and Adaptors
  • Performing Basic Fiber Test with Basic Instruments ( VFLs, Light Source, Power Meters)

Day 7

  • Optical Insertion Loss
  • Optical Return Loss
  • Optical Receiver Sensitivity
  • Advanced Fiber Optic Testing Using OTDRrs
  • Theory and Use of An OTDR
  • Single Wavelength Systems

Day 8

  • OTDR Event Definition
  • OTDR Trace Informatıon
  • Fiber End Location
  • Event Dead Zone
  • Dynamic Range
  • Attenuation Dead Zone
  • Acquisition Time
  • Pulse With and How It Affects
  • Dynamic Range
  • Launch Cable
  • Storing Traces, Naming Traces
  • and Transferring Traces to PC

Day 9

  • Station - Preparation
  • OTDR Setup
  • Use of Launch Cables
  • Dual Wavelength Testing
  • Measure Fiber Length
  • Bidirectional Testing
  • Measure Total Fiber Link Loss

Day 10

  • Station - Location
  • Fiber Breaks
  • Microbends
  • Macrobends
  • Splice Gain
  • Ghosts
  • Bad Splices
  • Fusion Splices
  • Mechanical Splices
  • Bad Patch Panel Connections

 

ETABS and SAFE. Training 24 CCE 210 5 SAP 2000. Training 25 CCE 305 5 Quality Assurance in Pavement Construction 26 CCE 401 5 Construction Project Management 27 CCE 402 10 Construction Project Management (10 Days) 28 CCE 403 5 Construction Project Management-Intensive 29 CCE 405 5 Principles of Construction Project Management 30 CCE 406 10 Principles of Construction Project Management (10 Days) 31 CCE 410 10 Construction Project and Risk Management (10 days) 32 CCE 411 5 Project & Contract Management for Marine Construction 33 CCE 412 5 Application of GIS in Construction Management 34 CCE 415 4 Sustainable Water Management Techniques, Innovation and Solution (4 Days) 35 CCE 419 5 Construction Management of Hydraulic Projects 36 CCE 420 5 Water Project Management 37 CCE 421 10 Modern Technologies in the Supervision and Quality Control of Irrigation Projects and Dealing with Contractors (10 Days) 38 CCE 422 5 Rapid Earthquake Hazard Evaluation of Buildings 39 CCE 425 10 Practical Application of Computers in Structural Engineering (10 Days) 40 CCE 428 5 Survey & Profile Using Total Station 41 CCE 430 5 Bridge Construction and Maintenance 42 CCE 435 5 Bridge Inspection and Maintenance 43 CCE-A 410 10 إدارة المشاريع الهندسية -10 أيام
21 - TTC - Transportation and Traffic Control
22 - ADV - Architectural Design and Visualization
23 - SRM - Safety and Occupational Health
24 - CSM - Public Relations, Communication Skills & Office Management
25 - TEM - Training and Education Management
26 - CMR - Customer Relations