(Click Category to List Courses)
10 - OGE-W - Oil & Gas - Well Construction and Drilling
OG-W 106 - Directional Drilling Technology
Code | Start Date | Duration | Venue | |
---|---|---|---|---|
OG-W 106 | 28 October 2024 | 5 Days | Istanbul | Registration Form Link |
OG-W 106 | 02 December 2024 | 5 Days | Istanbul | Registration Form Link |
OG-W 106 | 17 February 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 106 | 14 April 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 106 | 07 July 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 106 | 04 August 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 106 | 29 September 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 106 | 24 November 2025 | 5 Days | Istanbul | Registration Form Link |
OG-W 106 | 08 December 2025 | 5 Days | Istanbul | Registration Form Link |
Course Description
Directional Drilling Technology course is intended for individuals who will be working closely with drilling departments within their companies. This course will give participants a complete understanding of the processes involved in the directional drilling of oil and gas wells.
This course covers several topics which must be understood by DD and the client’s representative who supervision to the Deviated wells.
Understanding how a well plan (proposal) for a directional well calculated is one of the most important duties of the DD.
Course Objectives
- Describe the various systems of coordinates.
- List the various methods of calculating a directional survey.
- Explain what preliminary information for the directional well is needed from the client.
- Describe the effect on maximum angle of changing the KOP.
- Describe the four most common types of directional well profile.
- Explain the principle behind the traveling cylinder method & AC
- Explain what is meant by Ellipse of Uncertainty.
Who Should Attend?
- Drilling Engineering
- DSVs and WSG- well site geologist
- Reservoir Engineering
- Executive managers
- Executive managers
- Those involved in the design, Technical Assistants, Drillers, ADs
Course Details/Schedule
Day 1
- Directional Survey , Surveying terminology & calculation methods:
- Vertical Section Calculation
- Horizontal Section Calculation
- Survey Data (Static or Dynamic)
- Inclination
- Hole Direction (Azimuth)
- Steering Data (Dynamic)
- Magnetic Toolface
- Gravity Toolface
- Directional Surveying Devices
- Applications of an MWD tool
- MWD tools
Day 2
- Basic concepts of directional Drilling
- Well Profiles Terminology
- directional drilling Methods.
- Stabilization-2D
- Jetting
- Turbines / Motors (PDM’s) PDM positive displacement motor , Directional Drilling Troubleshooting (Down hole Fault)
- Rotary steerable system (RSS )3DS :Push the Bit, Point The Bit, Hybrid Push/Point the Bit
- Open Hole Whip-stocking
Day 3
- Bottom hole assemblies- rotary BHA design:
- BHA rotary tendency
- Calculate position of neutral point in drill string
- Kick offs, Sidetracks and Drilling Practices(Wellbore deviation techniques):
- The kick-off methods
- The different side track methods
- Where and why each method is preferred
- The techniques for sidetracking in open hole with or without cement plug
- Steering decisions to follow a planned wellpath
- Formation effects on BHA tendency
- An open & Cased Hole Whip-stock Sidetracking
- Orientation, Gyro single shot kickoff Procedure
Day 4
- Anti-Collision calculation .
- Drilling Practices for high angle wells
- Torque & Drag analysis :
- Explain and Calculate Side Forces
- Describe Stress/Strain relationship
- Explain and Calculate Bending, Shear Stress
- Explain and Calculate Von Mises Stress
- Explain and Calculate Buckling
Day 5
- Geosteering Applications
- Drilling Mechanics: Measurements and Interpretation (Software drilling vibration simulator )
- Software Compass (direction plan )