(Click Category to List Courses)
17 - MSE - Maintenance, Scheduling, Planning
MSE 132 - Operation and Maintenance of the Wastewater Treatment Plant
Code | Start Date | Duration | Venue | |
---|---|---|---|---|
MSE 132 | 16 December 2024 | 5 Days | Istanbul | Registration Form Link |
MSE 132 | 10 February 2025 | 5 Days | Istanbul | Registration Form Link |
MSE 132 | 07 April 2025 | 5 Days | Istanbul | Registration Form Link |
MSE 132 | 16 June 2025 | 5 Days | Istanbul | Registration Form Link |
MSE 132 | 28 July 2025 | 5 Days | Istanbul | Registration Form Link |
MSE 132 | 22 September 2025 | 5 Days | Istanbul | Registration Form Link |
MSE 132 | 17 November 2025 | 5 Days | Istanbul | Registration Form Link |
MSE 132 | 08 December 2025 | 5 Days | Istanbul | Registration Form Link |
Please contact us for fees
Course Description
The Participants will acquire an understanding of the wastewater reuse permits and standards, wastewater characterization, general plant description, monitoring, preventative maintenance, in addition to daily and monthly records and reporting.
Course Objectives
- Obtaining a good idea about wastewater reuse permits and standards
- Designing and conducting monitoring and surveillance program for the WWTP
- Learning how to conduct preventative maintenance
- Learning how to interpret WW characterization results
- Learning how to manage records and preparing reports
Who Should Attend?
- Wastewater treatment plant operators
- Muncibailites director of water and wastewater sections
- Environmental engineers
- WWTP technicians
Course Details/Schedule
Day 1
- Operator Responsibilities
- System Operator Training Requirements
- Management Responsibility
- Municipal Wastewater Reuse Permit
- Monitoring Requirements
Day 2
- Facility Description
- Principal Design Criteria
- Wastewater Characteristics
- Operation and Control of Unit Operations
- Wastewater Flow Meters
- Pressure Main
- Lagoon System
- Normal Operation
- Aeration System
- Process Controls
Day 3
- Operational Monitoring
- Operational Parameters
- General Monitoring Requirements for Lagoon Operation
- Compliance Monitoring
Day 4
- Analytical Methods
- Loading Rate Calculations
- Monitoring Quality Assurance
- Monitoring Summary
Day 5
- General Plant Appearance
- Equipment Maintenance and Scheduling
- Supplies and Spare Parts
- Plans and Specifications
- Daily Operating Log
- Operation, Sampling, and Testing Log
- Summary Reports
- Maintenance Records