TRAINING CATEGORIES
(Click Category to List Courses)

13 - OGE-S - Oil & Gas - Shipping and Storage


OG-S 119 - API 653 Storage Tank Inspector

Code Start Date Duration Venue
OG-S 119 30 December 2024 5 Days Istanbul Registration Form Link
OG-S 119 10 February 2025 5 Days Istanbul Registration Form Link
OG-S 119 07 April 2025 5 Days Istanbul Registration Form Link
OG-S 119 16 June 2025 5 Days Istanbul Registration Form Link
OG-S 119 28 July 2025 5 Days Istanbul Registration Form Link
OG-S 119 22 September 2025 5 Days Istanbul Registration Form Link
OG-S 119 17 November 2025 5 Days Istanbul Registration Form Link
OG-S 119 29 December 2025 5 Days Istanbul Registration Form Link
Please contact us for fees

 

Course Description

This training program on API 653: Tank Inspection, Repair, Alteration and Reconstruction will focus on learning the API 653 tank inspection code and provide information on the API 571, API 575, API 650, API 652, API 651, API 577, ASME Section V and ASME Section IX. The delegates will further receive instructions on operations, maintenance, and troubleshooting of the different types of aboveground storage tanks. 

Course Objectives

  • Providing enough knowledge to resolve and troubleshoot aboveground storage tanks issues as per API 653 code
  • Identifying the API 653 scope, suitability for service and evaluation of the tank shell 
  • Evaluating the tank bottom, including settlement and release prevention Systems (RPS)
  • Recognizing the reasons for Inspection and Causes of Deterioration
  • Determining the need for Cathodic Protection and explaining methods of Cathodic Protection
  • Employing post weld heat treatment, identify the Charpy impact testing
  • Carrying out welding discontinuities and discuss ASME section IX WPS &WPQ and PQR

Who Should Attend?

  • Quality Managers
  • Plant Engineer
  • Supervisors
  • Personnel involved in Above Ground Storage Tank Inspections

Course Details/Schedule

Day 1

  • Road map to API 653 and associated codes
  • Damage mechanisms applicable to aboveground storage tanks
  • Suitability for Service:
  • Tank roof evaluation
  • Tank shell evaluation
  • Tank bottom evaluation
  • Tank foundation evaluation
  • Brittle fracture consideration
  • Tank material consideration
  • New materials
  • Original materials for reconstructed tanks
  • Welding consumables

Day 2

  • Tank repair and alteration
  • Removal and replacement of ahell plate material
  • Shell Repairs Using Lap- welded Patch Plates
  • Repair of defects in shell plate material
  • Alteration of tank shells to change shell height
  • Repair of defective welds
  • Repair of shell penetrations
  • Addition or replacement of shell penetrations
  • Alteration of existing shell penetrations
  • Repair of tank bottoms
  • Repair of fixed roofs
  • Repair of floating roofs
  • Repair or replacement of floating roof perimeter seals
  • Hot taps

Day 3

  • Welding qualifications
  • Identification and records
  • Preheat or controlled deposition welding methods as alternatives to post- weld heat
  • Treatment (PWHT)
  • Welding safety
  • Examination and testing
  • NDE
  • Radiographs
  • Hydrostatic testing
  • Leak tests
  • Measured settlement during hydrostatic testing
  • Subsidiary API 653 codes (API 650 – API 651 – API 652 - API 575 – API 571)

Day 4

  • Aboveground tanks safe operation
  • Tanks commissioning
  • Storage tanks troubleshooting
  • Technical comparison between different tanks types
  • Tanks parts failure and safe supervision

Day 5

  • Gas freeing of tanks and vessels
  • Methods of gauging tanks
  • Static tlectricity
  • Oil spills emergency
  • Cleaning of oil products tanks
  • Storage tanks checklists

 

ETABS and SAFE. Training 24 CCE 210 5 SAP 2000. Training 25 CCE 305 5 Quality Assurance in Pavement Construction 26 CCE 401 5 Construction Project Management 27 CCE 402 10 Construction Project Management (10 Days) 28 CCE 403 5 Construction Project Management-Intensive 29 CCE 405 5 Principles of Construction Project Management 30 CCE 406 10 Principles of Construction Project Management (10 Days) 31 CCE 410 10 Construction Project and Risk Management (10 days) 32 CCE 411 5 Project & Contract Management for Marine Construction 33 CCE 412 5 Application of GIS in Construction Management 34 CCE 415 4 Sustainable Water Management Techniques, Innovation and Solution (4 Days) 35 CCE 419 5 Construction Management of Hydraulic Projects 36 CCE 420 5 Water Project Management 37 CCE 421 10 Modern Technologies in the Supervision and Quality Control of Irrigation Projects and Dealing with Contractors (10 Days) 38 CCE 422 5 Rapid Earthquake Hazard Evaluation of Buildings 39 CCE 425 10 Practical Application of Computers in Structural Engineering (10 Days) 40 CCE 428 5 Survey & Profile Using Total Station 41 CCE 430 5 Bridge Construction and Maintenance 42 CCE 435 5 Bridge Inspection and Maintenance 43 CCE-A 410 10 إدارة المشاريع الهندسية -10 أيام
21 - TTC - Transportation and Traffic Control
22 - ADV - Architectural Design and Visualization
23 - SRM - Safety and Occupational Health
24 - CSM - Public Relations, Communication Skills & Office Management
25 - TEM - Training and Education Management
26 - CMR - Customer Relations